欢迎访问无锡市思必德科技有限公司网站!公司15年的环氧地坪工程技术经验值得您信赖!!
思必德
 
 
十五年专注于环氧地坪设计施工工程
普通型环氧地坪
环氧砂浆地坪
环氧彩砂地坪
环氧自流平地坪
环氧防静电地坪
环氧玻璃钢(FRP)地坪
乙烯基酯重防腐地坪
非金属金属耐磨地坪
混凝土渗透性密封剂
自流平水泥地坪
丙烯酸地坪
EPPU聚合型工业地坪
停车场地坪
环保型无毒防霉墙面
有机硅丙烯酸室外防腐
PVC地坪
 
当前位置 -> 首页新闻资讯为什么无锡环氧地坪漆施工的地面不能含有水分 发布时间:(2019/2/16)

为什么无锡环氧地坪漆施工的地面不能含有水分

标签:混凝土密封固化剂 | 混凝土密封固化剂厂家

各种环氧地坪的施工,如果处理不好的话,地面会有水分存在,很多人不知道为什么地面会有水,你知道地面有水的话对整体的地面施工有怎么样的影响吗?其实地面基层有水分的存在,对我们的施工是不利的,环氧地坪漆施工害怕地面的含有水分。所以施工前一定要处理好地面水分问题,施工前根据地面含水分情况做出一份处理的方案。具体如下:

All kinds of floor construction, if not handled properly, there will be water on the ground. Many people do not know why there will be water on the ground. Do you know how the water on the ground will affect the overall ground construction? In fact, the existence of water on the ground base is not conducive to our construction, and the construction of epoxy floor paint is afraid of the water on the ground. Therefore, before construction, we must deal with the problem of surface water, and make a treatment plan according to the situation of surface water before construction. Specifically as follows: 混凝土含水率应小于9%,否则应排除水分后方可进行涂装。排除水分的方法有以下几种:

The moisture content of concrete should be less than 9%. Otherwise, the water content should be excluded before coating. There are several ways to remove moisture:

a)通风:加强空气循环,加速空气流动,带走水分,促进混凝土中水分进一步挥发。

A) Ventilation: Enhance air circulation, accelerate air flow, take away moisture, and promote further volatilization of moisture in concrete.

b)加热:提高混凝土及空气的温度,加快混凝土中水份迁移到表层的速率,使其迅速蒸发,宜采用强制空气加热或辐射加热。直接用火源加热时生成的燃烧产物(包括水),会提高空气的雾点温度,导致水在混凝土上凝结,故不宜采用。

B) Heating: Increase the temperature of concrete and air, accelerate the rate of moisture migration to the surface of concrete, and make it evaporate rapidly. It is advisable to use forced air heating or radiation heating. The combustion products (including water) produced by direct heating with fire source will increase the temperature of air fog point and cause water to condense on concrete, so it is not suitable to use them.

c)降低空气中的露点温度:用脱水减湿剂、 环氧树脂地板漆除湿器或引进室外空气(引进室外空气露点低于混凝土表面及上方的温度)等方法除去空气中的水汽。

C) Reducing dew point temperature in air: dehydrating dehumidifier, epoxy floor paint dehumidifier or introducing outdoor air (introducing outdoor air dew point lower than concrete surface and above the temperature) and other methods to remove water vapor in air.

1.中涂层

1. medium coating

①施工前需要保持干净如有杂物粘附需清除依照正确 比例将主剂及硬化剂混合,充分搅拌;

(1) Before construction, it is necessary to keep clean. If debris adheres, it is necessary to remove and mix the main agent and hardening agent according to the correct proportion and mix them fully.

②将混合完成的树脂适量加入石英砂;

(2) Quartz sand should be added to the mixed resin.

③使用镘刀将材料均匀涂布;

(3) Apply the material evenly with a trowel knife;

④混合完成材料需30分钟以内施工完成;

(4) It takes less than 30 minutes to complete the construction of the mixed materials.

⑤施工交接处做好交接处理;

(5) Handover treatment should be done at the construction handover site;

⑥中涂层养生硬化时间约8小时以上。

_The curing and hardening time of the middle coating is more than 8 hours.

2.素地处理

2. Plain treatment

①基础素地以水泥粉光面或磨石地为准;

(1) The basic plain ground shall be cement flour or grindstone ground;

②素地需养生28天以上,水份需8%以下方可施工素地如有不平或空鼓需加以除去;

(2) The vegetable land should be kept in good health for more than 28 days, and the water content should be less than 8% before it can be removed if there is unevenness or empty drum in the construction of the vegetable land.

③用环氧砂浆补平地面;

(3) Leveling the ground with epoxy mortar;

④素地之油污需澈底清洗干净;

(4) Oil contamination of plain land should be cleaned thoroughly.

⑤施工前需保持施工素地之干燥和清洁;

(5) Keep the construction site dry and clean before construction;

3.底涂层

3. bottom coating

①施工前需保持干净如有杂物粘附需清除依照正确比例将主剂及硬化剂混合,充分搅拌;

1. Keep clean before construction. If there is any debris adhesion, remove the main agent and hardening agent according to the correct proportion and mix them fully.

②需视地面情况调整适当粘度混合完成材料需4小时以内施工完成;

(2) It takes less than 4 hours to finish the construction by adjusting the proper viscosity of the mixing material according to the ground conditions.

③底涂层养生硬化时间约8小时以上。

Thirdly, the curing and hardening time of the base coating is more than 8 hours.

4.批土层

The 4. batch of soil layer

①依照正确比例将主剂及硬化剂混合,充分搅拌;

1. Mix the main agent and hardener according to the correct proportion and mix them fully.

②使用批刀将材料涂布均匀;

(2) Use batch knife to coat the material evenly;

③混合完成材料需30分钟内施工完成;

(3) It takes 30 minutes to complete the construction of the mixed materials.

地面基层有水,对施工的一些影响,以及排除水分的办法我们都有一些介绍,其实基层排水通过加热,以此来提高混凝土及空气的温度,加快混凝土中水分迅速蒸发,从而排除水分。

There is water in the ground base, which has some influence on the construction and the method of removing water. In fact, the drainage of the ground base is heated to increase the temperature of concrete and air, accelerate the rapid evaporation of water in concrete, so as to remove water.

本站网址:http://www.wuxispeed.com


来源:无锡环氧地坪公司  浏览次数:1036
相关阅读:无锡环氧地坪的施工第一个基本步骤是底层涂漆 | 低温下无锡环氧地坪的施工减慢涂料反应解决方法 | 环氧地坪施工为何要进行固化处理?
 
 
产品分类    
普通型环氧地坪 环氧玻璃钢(FRP)地坪 丙烯酸地坪
环氧砂浆地坪 乙烯基酯重防腐地坪 EPPU聚合型工业地坪
环氧彩砂地坪 非金属金属耐磨地坪 停车场地坪
环氧自流平地坪 混凝土密封固化剂 环保型无毒防霉墙面
环氧防静电地坪 自流平水泥地坪 有机硅丙烯酸室外防腐地坪


联系我们
电 话:0510-88706248/13915319875
传 真:0510-88706348
邮 箱:Yxdspeed@163.com
网 址:www.wuxispeed.com
地 址:无锡市东亭锡沪东路11号
版权所有:无锡市思必德科技有限公司    网站关键词:无锡环氧地坪  混凝土密封固化剂  苏ICP备20046775号    技术支持:无锡易商科技    网站地图
友情链接:梳理机 台州讨债公司 合肥讨债公司 金华讨债公司 盐城环氧地坪 合肥停息挂账 无锡保洁公司 脚手架厂家 无锡环氧地坪