环氧地坪漆施工进程中涂敷保护剂首要是防止外表水分的蒸发,保证耐磨强度的安稳性,地上混凝土分区浇筑。留神施工次序从一个方向进行,并考虑互相联络面的一同性;用机械镘带圆拍浆,纤细处用木镘刀收边,首要是对混凝土外表压光并减少浮浆,留神依浇筑同方向镘光。已镘好的水泥地上上均匀地撒布在2/3单位用量的硬化剂耐磨材料;由于现场条件凌乱,全部的土建施工和设备结束后,发现有破损的当地,能够很便利的用耐磨材料和粘接剂直接在修补混凝土面层。也许色彩略微有些不相同,但不影响整体性。
In the construction process of epoxy floor paint, the first thing to apply protective agent is to prevent the evaporation of surface moisture, to ensure the stability of wear resistance, and to cast concrete in different zones on the ground. Pay attention to the construction sequence from one direction, and consider the similarity of the contact surface; use mechanical trowel belt round beating pulp, fine edge closure with trowel knife, the first thing is to calm the surface of concrete and reduce the floating pulp, pay attention to the same direction of casting trowel. The hardening agent wear-resisting material with 2/3 unit dosage is evenly distributed on the cement floor which has been cured. Due to the messy site conditions, after all the civil construction and equipment are finished, it is found that the damaged areas can be easily repaired directly with wear-resisting materials and adhesives. Maybe the color is slightly different, but it does not affect the integrity. 环氧地坪漆用机械镘(金属圆盘)来回多次镘光,纤细边角处用手工镘刀协作施工,视温度、湿度断定下一道工序时间;剩余1/3单位用量的硬化剂耐磨材料均匀的撒布在混凝土的外表,用加装圆盘的机械镘纵横交错的作业,至少在二编以上;环氧地坪的外表初步硬化时。
Epoxy floor paint uses mechanical trowels (metal discs) to and fro for many times, and manual trowels to construct thin edges and corners to determine the next process time according to temperature and humidity. The remaining 1/3 unit of hardener wear-resistant materials are evenly distributed on the surface of concrete, and mechanical trowels with discs are used for crisscross-cutting operations, at least in the second part; the surface of the floor is initially hardened.
用加装金属刀片的机械镘进行打磨压光,反复操作3~4次;施工人员须穿戴软质平底鞋,防止损坏外表)纤细边角处用手工压光;这一点十分的首要,一般一般环氧地坪都会做,做的也差不多,就是这个后期作业没有做好直接致使了地坪的质量,保护时间为7天。
The mechanical trowel with metal blades is used for polishing and calendering and repeated operation for 3 to 4 times; the constructors must wear soft flat shoes to prevent damage to the appearance) and hand calender the thin edges and corners; this is very important, generally the floor will do, and do the same, that is, the late operation is not done well directly resulting in the quality of the floor, the protection time is 7 days. 本站网址:http://www.wuxispeed.com
|