需求关于原有的素地(水泥或者水磨石高空)停止预解决,施工环氧地坪漆以前。这一步非常紧张,只要解决患上好,能力保障环氧地坪漆层与原高空的附着力精良,间接干系到应用寿命及外表成果。肃清外表水泥浮浆或者别的粘附物,a选用适合的业余高空无尘打磨机(普通由美国、德国以及台湾出口)关于素地停止片面打磨。将外表打磨毛糙,以增加下一步与环氧漆层之间的附着力。b采纳大功率吸尘器片面吸尘解决洁净。以确保该边沿地带环氧地坪漆的附着力。c有触动的呆板设施内、外接地边沿作重点人工打毛解决。
Demand for the original plain land (cement or terrazzo high altitude) to stop pre-solution, before the construction of epoxy floor paint. This step is very tense, as long as the solution is good, the ability to protect the epoxy floor paint layer and the original high-altitude adhesion is excellent, indirectly related to the application life and appearance results. Clean up the surface cement slurry or other adhesives, a choose suitable amateur high-altitude dust-free grinder (usually exported by the United States, Germany and Taiwan) on plain ground to stop one-sided grinding. Grind the surface roughly to increase the adhesion between the next step and the epoxy coating. B Adopt one-sided vacuum cleaner with high power to solve the problem of cleanliness. To ensure the adhesion of epoxy floor paint on the edge zone. C. The key points of manual grooming are the inner and outer grounding edges of the touching rigid facilities. 如发明有油渍,a关于素地停止细心反省。需用公用干净剂停止除了油荡涤,关于于湿润的高空,需求业余烘干东西停止烘干。用树脂沙浆事后补平。b关于于裂痕以及小坑、凹洞等。用切割机切成0.5cm0.5cm凹槽,c关于于高空有规定的裂痕。再用柔性环氧树脂沙浆停止平坦解决
If there is oil stain in the invention, a stop careful reflection on plain land. Common detergents are needed to stop drying except oil, and amateur driers are needed to stop drying at wet altitudes. Use resin mortar to make up after the event. B About cracks, pits, holes, etc. Cut 0.5 cm 0.5 cm groove with cutting machine. C has specified cracks at high altitude. Reuse flexible epoxy mortar to stop flattening
缩小尘土的发生。1如上一条办法采纳无尘打磨机并共同大功率吸尘器作高空打磨。如仪表等,2关于于精细的呆板设施。用PVC薄膜包罩防尘。以防沾上油漆,3用胶带纸贴好呆板以及墙面、门窗的底边。施工完后撕失落。
Reduce the occurrence of dust. As mentioned above, dust-free grinder and high-power vacuum cleaner are adopted for high-altitude grinding. For example, instrumentation and so on. 2. About fine rigid facilities. Cover with PVC film to prevent dust. In order to prevent painting, 3 with tape paper stick rigid and wall, doors and windows of the bottom. Tear off after construction.
确保基面含水率低于8%1施工前7天内高空不患上沾水以及荡涤。
Make sure that the moisture content of the base surface is less than 8% 1 and that no water staining and cleaning will occur at high altitude within 7 days before construction. 本站网址:http://www.wuxispeed.com
|